Structural Alterations

Open plan, properly supported.

Get a Free Quote

Removing or altering a load-bearing wall is engineering work first and carpentry second. We arrange the structural design, the permit, temporary shoring and the beam install, then make good so the change looks like it was always there.

Suits owners opening kitchens to living areas, creating wider openings to additions, or repairing sagging floors.

What's included

Everything, itemised

Your quote lists each of these as its own line, so nothing is assumed.

Scope

  • Structural engineering and stamped drawings
  • Building permit and inspections
  • Temporary shoring walls
  • Steel or engineered wood beams
  • Posts, point loads and footings
  • Re-routing of electrical, plumbing and ducts

Making good

  • Drywall and taping
  • Flush or dropped beam finishing
  • Floor patching across removed walls
  • Trim and paint

Options

Choose the right approach

Flush beam

Recessed into the ceiling for a clean, uninterrupted line.

Best for: Open-concept main floors

Dropped beam

Sits below the ceiling — simpler and often more economical.

Best for: Where ceiling depth is limited

Indicative costs

Guide price ranges

Load-bearing wall removal
To be confirmed
New openings & beams
To be confirmed

Guide prices vary with size, specification and site conditions — your itemised quote will confirm the exact figure before any work begins.

Typical timeline

Phase by phase

  1. 1Engineering & permit2–6 weeks
  2. 2Temporary shoring & removal2–4 days
  3. 3Beam, posts & inspection1 week
  4. 4Drywall & making good1–2 weeks

Permits: A building permit and engineer's drawings are always required

Process

How a structural alterations project runs

  1. 01

    Enquiry

    Tell us what you have in mind and roughly when you'd like to start.

  2. 02

    Site visit & measure

    We open small inspection holes if needed and confirm what the wall is carrying.

  3. 03

    Itemised quote

    A line-by-line price with exclusions spelled out, so you can compare like for like.

  4. 04

    Build & manage

    Shoring goes up before anything comes down, and inspection happens before close-in.

  5. 05

    Walkthrough & aftercare

    We walk the finished space with you, close out every deficiency and stay on call under warranty.

Gallery

Recent work

FAQs

Structural Alterations: your questions

Tell us about your project

Four details and we'll take it from there. You'll finish the full request on the next page.

Call nowFree quote