Skip to content
DWBCONSTRUCTION
Renovated bathroom with large-format grey porcelain tile, frameless glass shower and walnut floating vanity

Bathroom Renovations

Built to stay watertight long after the grout is dry.

Get a Free Quote

A good bathroom is mostly invisible: proper waterproofing, correct slopes, ventilation that actually clears steam. We get those right, then finish with careful tile setting and fixtures.

Suits main bathrooms, primary ensuites, accessibility upgrades and powder rooms.

What's included

Everything, itemised

Your quote lists each of these as its own line, so nothing is assumed.

Scope

  • Demolition to studs or subfloor
  • Plumbing relocation and new rough-in
  • Subfloor repair and levelling
  • Bathroom fan ducted to exterior
  • Electrical, lighting and heated floor circuits
  • Sheet or liquid waterproofing systems

Finishing

  • Tile setting on floors and walls
  • Curbless and linear-drain showers
  • Vanity, toilet and fixture install
  • Glass shower enclosure coordination
  • Trim, paint and accessories

Options

Choose the right approach

Powder room

Compact refresh with vanity, toilet and feature finishes.

Best for: Quick upgrades

Main bathroom

Tub or shower, new tile and fixtures, improved storage.

Best for: Family bathrooms

Primary ensuite

Walk-in shower, double vanity, heated floors.

Best for: Larger renovations

Indicative costs

Guide price ranges

Powder room
To be confirmed
Main bathroom
To be confirmed
Primary ensuite
To be confirmed

Guide prices vary with size, specification and site conditions — your itemised quote will confirm the exact figure before any work begins.

Typical timeline

Phase by phase

  1. 1Design & selections2–4 weeks
  2. 2Demolition & rough-ins1 week
  3. 3Waterproofing & tile1–2 weeks
  4. 4Fixtures, vanity & glass1 week

Permits: Required when plumbing is relocated or added

Process

How a bathrooms project runs

  1. 01

    Enquiry

    Tell us what you have in mind and roughly when you'd like to start.

  2. 02

    Site visit & measure

    We check plumbing, venting and the subfloor, and discuss tile and fixture choices.

  3. 03

    Itemised quote

    A line-by-line price with exclusions spelled out, so you can compare like for like.

  4. 04

    Build & manage

    Waterproofing is tested before tile goes on, and we photograph every stage.

  5. 05

    Walkthrough & aftercare

    We walk the finished space with you, close out every deficiency and stay on call under warranty.

Gallery

Recent work

FAQs

Bathrooms: your questions

Tell us about your project

Four details and we'll take it from there. You'll finish the full request on the next page.

Call nowFree quote