Full-Home Renovations

Keep the address, change everything else.

Get a Free Quote

A full-home renovation reworks layout, systems and finishes in one coordinated project. We manage design, structural changes, permits, every trade and every inspection so you deal with one team and one schedule.

It suits owners of older homes who love the neighbourhood but not the floor plan, and buyers who purchased a dated house to make it their own.

What's included

Everything, itemised

Your quote lists each of these as its own line, so nothing is assumed.

Planning

  • Design and selections support
  • Structural review and engineering
  • Building permits and inspections
  • Asbestos and hazardous material testing coordination

Construction

  • Selective demolition and disposal
  • Load-bearing wall removal and beams
  • Electrical panel upgrades and rewiring
  • Plumbing replacement and relocation
  • HVAC upgrades and ductwork
  • Insulation and air sealing

Finishes

  • Drywall and taping
  • Kitchens and bathrooms
  • Flooring throughout
  • Stairs, railings, trim and doors
  • Painting and final clean

Options

Choose the right approach

Main-floor renovation

Opens up living, dining and kitchen while leaving upper floors in use.

Best for: Living in during the work

Full gut renovation

Back to studs on every floor for new systems, layout and finishes.

Best for: Older homes needing a reset

Indicative costs

Guide price ranges

Main-floor renovation
To be confirmed
Full-home renovation
To be confirmed

Guide prices vary with size, specification and site conditions — your itemised quote will confirm the exact figure before any work begins.

Typical timeline

Phase by phase

  1. 1Design & selections3–6 weeks
  2. 2Permit reviewVaries
  3. 3Demolition & structural2–4 weeks
  4. 4Rough-ins & inspections3–4 weeks
  5. 5Drywall & finishes6–10 weeks

Permits: Depends on structural scope; cosmetic work may not need a permit

Process

How a renovations project runs

  1. 01

    Enquiry

    Tell us what you have in mind and roughly when you'd like to start.

  2. 02

    Site visit & measure

    We walk every floor, note structure and systems, and discuss what to keep and what to change.

  3. 03

    Itemised quote

    A line-by-line price with exclusions spelled out, so you can compare like for like.

  4. 04

    Build & manage

    Work is phased so demolition, structure, rough-ins and finishes follow a clear critical path.

  5. 05

    Walkthrough & aftercare

    We walk the finished space with you, close out every deficiency and stay on call under warranty.

Gallery

Recent work

FAQs

Renovations: your questions