Kitchen Renovations

A kitchen that works on a Tuesday night, not just in photos.

Get a Free Quote

We renovate kitchens with the same discipline as larger projects: measured layouts, correct electrical and ventilation, level cabinet installs and clean finishing details.

Ideal for owners refreshing a dated kitchen, opening up to a family room, or fitting cabinetry they've already purchased.

What's included

Everything, itemised

Your quote lists each of these as its own line, so nothing is assumed.

Scope

  • Layout planning and measured drawings
  • Demolition and disposal
  • Wall removal or new openings
  • Electrical circuits for appliances and lighting
  • Plumbing for sink, dishwasher and fridge line
  • Range hood ducting to exterior

Finishing

  • Drywall repair and paint
  • Flooring
  • Cabinet installation and adjustment
  • Countertop templating and install coordination
  • Backsplash tile setting
  • Fixtures, hardware and appliance hook-up

Options

Choose the right approach

Refresh

New cabinets, counters and finishes within the existing layout.

Best for: Faster timelines, lighter budgets

Full renovation

Reworked layout, relocated services and new openings.

Best for: Kitchens that don't function

Install only

We install cabinetry you've sourced, with all trades coordinated.

Best for: Owners who have already ordered

Indicative costs

Guide price ranges

Refresh in existing layout
To be confirmed
Full kitchen renovation
To be confirmed

Guide prices vary with size, specification and site conditions — your itemised quote will confirm the exact figure before any work begins.

Typical timeline

Phase by phase

  1. 1Design & cabinet order4–8 weeks
  2. 2Demolition & rough-ins1–2 weeks
  3. 3Drywall & flooring1–2 weeks
  4. 4Cabinets, counters & backsplash2–3 weeks

Permits: Only required if walls, plumbing or electrical are relocated

Process

How a kitchens project runs

  1. 01

    Enquiry

    Tell us what you have in mind and roughly when you'd like to start.

  2. 02

    Site visit & measure

    We measure, check services and venting, and talk through how you cook and gather.

  3. 03

    Itemised quote

    A line-by-line price with exclusions spelled out, so you can compare like for like.

  4. 04

    Build & manage

    Cabinet lead times drive the schedule — we sequence demolition so you're without a kitchen for as little time as possible.

  5. 05

    Walkthrough & aftercare

    We walk the finished space with you, close out every deficiency and stay on call under warranty.