We renovate kitchens with the same discipline as larger projects: measured layouts, correct electrical and ventilation, level cabinet installs and clean finishing details.
Ideal for owners refreshing a dated kitchen, opening up to a family room, or fitting cabinetry they've already purchased.
What's included
Everything, itemised
Your quote lists each of these as its own line, so nothing is assumed.
Scope
- Layout planning and measured drawings
- Demolition and disposal
- Wall removal or new openings
- Electrical circuits for appliances and lighting
- Plumbing for sink, dishwasher and fridge line
- Range hood ducting to exterior
Finishing
- Drywall repair and paint
- Flooring
- Cabinet installation and adjustment
- Countertop templating and install coordination
- Backsplash tile setting
- Fixtures, hardware and appliance hook-up
Options
Choose the right approach
Refresh
New cabinets, counters and finishes within the existing layout.
Best for: Faster timelines, lighter budgets
Full renovation
Reworked layout, relocated services and new openings.
Best for: Kitchens that don't function
Install only
We install cabinetry you've sourced, with all trades coordinated.
Best for: Owners who have already ordered
Indicative costs
Guide price ranges
- Refresh in existing layout
- To be confirmed
- Full kitchen renovation
- To be confirmed
Guide prices vary with size, specification and site conditions — your itemised quote will confirm the exact figure before any work begins.
Typical timeline
Phase by phase
- 1Design & cabinet order4–8 weeks
- 2Demolition & rough-ins1–2 weeks
- 3Drywall & flooring1–2 weeks
- 4Cabinets, counters & backsplash2–3 weeks
Permits: Only required if walls, plumbing or electrical are relocated
Process
How a kitchens project runs
- 01
Enquiry
Tell us what you have in mind and roughly when you'd like to start.
- 02
Site visit & measure
We measure, check services and venting, and talk through how you cook and gather.
- 03
Itemised quote
A line-by-line price with exclusions spelled out, so you can compare like for like.
- 04
Build & manage
Cabinet lead times drive the schedule — we sequence demolition so you're without a kitchen for as little time as possible.
- 05
Walkthrough & aftercare
We walk the finished space with you, close out every deficiency and stay on call under warranty.